ٍEmployee experiences

Level 2 Automation

Design and implementation of level 2 industrial automation of slab-bloom-billet caster in khuzestan steel complex

Design and implementation of level 2 industrial automation of slab caster in hormozgan steel complex

Design and implementation of level 2 industrial automation of billet caster in  sirjan jahan steel company

Design and implementation of level 2 industrial automation of EAF ( electric arc furnace  ) in khuzestan steel complex

Design and implementation of level 2 industrial automation of LF ( ladle furnace  ) in khuzestan steel complex


Level 1 Automation

Replacing and upgrading the Load Shedding control system of the distribution power plant of Mobarake steel complex from PLC-S5 to PLC-S7


Replacing and upgrading the ladle furnace control systems of 
khuzestan Steel Complex from PLC-S5 to PLC-S7


Changing and upgrading the electric arc furnace control systems of the khuzestan Steel Complex steel making plant from PLC-S5 to PLC-S7

Design and implementation of the control system of EAF and LF dust collectors of the steel making Plant of  Mobarakeh steel complex based on PLC-S7

Upgrading the control system of the water treatment plant of Mobarakeh Steel complex based on PLC-S7

Design and implementation of copper extraction control system by leaching method of Miduk copper extraction  plant based on PLC-S7

Design and implementation of the material handling control system of the steel making plant of Mobarakeh Steel Complex based on PLC-S7

Replacing the degassing control system of the steel making Plant of the Mobarakeh Steel Complex from the logic relay to PLC-S7

Setting up the data logger systems of the hot rolling mill plant and slab casting plant of Mobarakeh Steel Complex based on IBA-PDA

Design and implementation of the automation system of the Material Handling of Arfa Steel Making plant

Programming and commissioning of Khoozestan direct reduction Iron Plant control systems based on ABB DCS 800xA industrial IT

Programming and setting up the control system of preheated furnaces, hot rolling of Mobarake Steel Complex base on PLC-S7-417H and PCS7 software

Commisioning of the Kerman steel water  threatment plant control system

Upgrading the monitoring system of Iran Oil Pipelines and Telecommunications Company

Design and installation of paint spray control system